Lock the weights with the sponsor before anyone sits through a demo. Changing them afterwards looks like you fitted the answer. Score 1-5 after the demos, not during.
Excel workbook
A vendor can win the weighted total and still be the wrong buy. If they cannot produce a board pack in the product, will not write down price including implementation and uplift, tax first-line seats in a way that blocks rollout, or have no usable export path - they are out, regardless of the number.
A 5 is rare. If every vendor is a 4 or 5, the criteria are not discriminating. Score independently, then take 30 minutes to agree. Average is fine. Consensus theatre is not required.